LEANODM.com | Product Assembly & Packaging Project Brief Use this checklist to prepare a manufacturing review or quote request. Downloading or completing this file does not submit an enquiry. 1. PRODUCT AND COMPONENTS Product / intended use: Drawing and specification revisions: Component list / bill of materials: Plastic, metal and electronic components: Reference sample available: 2. ASSEMBLY REQUIREMENTS Component positioning and locating features: Housing alignment / fit requirements: Spring, latch and other mechanical parts: Fastening positions and sequence: Screw type / size, fixing materials and fixture requirements: Torque specification, verification method and required records: Manual or automatic fastening considerations: Moving surfaces and lubrication requirements: Surface cleanliness and cosmetic requirements: 3. HAND-SOLDERED CONNECTIONS (WHERE APPLICABLE) Connection drawing, wire / terminal / pad details: Solder material and component heat limits: Tip / tooling and temperature / time requirements to confirm: Acceptable joint reference and defect criteria: Required electrical / mechanical verification: 4. INSPECTION Color, transparency and surface criteria: Print position, accuracy and clarity: Opening, closing and locking requirements: Component retention requirements: Applicable inspection criteria and reference samples: First-piece confirmation and in-process inspection requirements: NG segregation, rework and reinspection requirements: Additional tests to review (do not assume included): 5. PACKAGING Product, component and accessory set: Individual bagging requirements: Protection / inserts and cleanliness requirements: Placement and arrangement: Carton and presentation specifications: Artwork and label requirements to review: Packed quantity and carton count requirements: Loose parts, tool / sharp-object control and foreign-object checks: BIQC / final inspection scope and required customer inspection: 6. PROJECT SCOPE Required development / molding / assembly / packing scope: Target quantity: Intended market: Requested timing: Open engineering questions: Project scope, acceptance criteria and any external operations need to be confirmed before production. Provide the information necessary for review; agree how restricted drawings and customer information will be exchanged.